Solar panel installation process

01
Site visit
We come to your house to have assess your electrical panel installation. We determine if there are access issues.
02
Truss Engineering
We will come to your home to inspect the existing roof structure and take measurements. All the data will be reviewed by an engineering team to draw the site plan.


03
Permitting
When the engineer has given the green light, we apply for a building permit, submitting the stamped drawings we got in the last step. Once approved the installation can begin.
04
Solar installation
Once the equipment for the project has arrived we get to work on the roof to install your panels. This step typically takes up to a week. Once we are done on the roof, the inverter and disconnect are installed.


05
Commissioning
Lastly, we call ESA to come and inspect the electrical system that was added to your home for code compliance. Once this is complete we turn on the system and ensure that it is perfoming as expected.